Roads and Infrastructure in Al Ebb and Leabaib – Package 01

The DN099 AI Ebb and Leabaib - Package 01 scheme is located approximately within Zone 70 of Qatar Area Referencing System (QARS), approximately 11.8km North-West of the centre of Doha, on the Eastern side of Al Shamal Road. The Project covers an area of approximately 243.60 ha.

The main objective of this Project is to provide full infrastructure to the project area, including improvements of roads, surface water network, foul sewer, landscape and TSE, and other required utilities.

    • project
    • Public Works Authority

General Scope of Works includes the following:

Roads :   26 KM
Landscape :   25,909 m2
Treated Sewage Effluent (TSE)  :   14.538 Km
Street Lighting  :   8.091 Km
Telecommunication  :   14.300 Km
Electricity Cables LV & MV  :   15.330 Km
Water Mains Plot Connections  :   8.236 Km
Surface Water Pipelines laid by Micro tunneling  :  5 Km
Surface Water Pipelines laid in Open Trenches  :   22.295 Km
Foul Water Pipelines laid by Micro tunneling  :   4.9 Km
Foul Water Pipelines laid in Open Trenches  :   19.565 Km