Design, procurement, construction, testing, commissioning, completion and defects correction of the two interceptors from Wakra-Wukair and the Industrial Area which both connect to the Drainage Tunnel (DT) at shaft WS07, associated access shafts and hydraulic connections.
Geotunnel made the deepest Shaft for Micro tunneling works with this project, having a depth of 48 Meters.