DB Contract for FRP 4 for Surface and Groundwater Network at Al Sadd and Al Nasr

The Works include the design, procurement, construction, testing, commissioning, completion and defects correction. The scope entails Foul Sewer scope of work is to rehabilitate/construct a trunk sewer network in Al Sadd, integrate the proposed sewer network with the existing foul sewer network, upgrade the existing undersized/surcharging sewers, and construct proposed /existing house connections along the proposed network sewers.in Zone 38 and 39 and additional SW Networks, FS Networks, micro-tunneling works, road works, street lighting, and hard landscape in Zone 27

    • project
    • Public Works Authority

General Scope of Works includes the following:

Roads  :   203,128.00 m2
Interlock  :   186,744 m2
Kerbs  :   60,365 LM
Street Lighting Cable  :   23,419 LM
Street Light Pole  :   607 nos.
LV &MV Cable Relocated  :   1,052 LM
Foul Sewer Network  :   9,116 LM
House Connection  :   507 nos.
Foul Sewer Manhole  :   337 nos.
Surface Water Network  :   20,501 LM
Surface Water Manholes  :   415 nos.
Surface Water Gullies  :   2,037 nos